Outrigger welding production line
Classification:
Key words:
Arc Welding Technology | Robotic System Integration | Automation and Intelligent Manufacturing
Detailed description
The crane outrigger line is planned according to the capacity of 30min/trolley, compatible with 17 products; the production line realizes automatic loading and unloading through truss robots, roller conveyor lines and conveyor trolleys (AGV), robots complete welding, and manually completes the repair welding work. The production line is equipped with a central control room, which is docked with the workshop MES system, allowing real-time flow and storage of production information such as line status information, production information, parameter information, alarm information, energy consumption information, etc. The production line has completely solved the problem of traditional manual production.
The production line completely solves the traditional manual assembly process, manual welding process, environmental protection, logistics and transportation and other aspects of the industry pain points, in the labor efficiency, production capacity, the cost of a single unit of labor has been greatly improved.
Inquiry
Xuzhou Huaheng Robotics Co., Ltd.
Phone: 0086-516-66882288
Kunshan Huaheng Robotics Co., Ltd.
Phone: 0086-512-87880678
Focus on Robot Division
Huaheng mobile phone terminal
Huaheng Company Public Number
Copyright © 2024 Xuzhou Huaheng Robotics Co., Ltd. All Rights Reserved